go to text

Shuttle service to and from Oirase Keiryu Onsen, Lake Towada Yasumiya, and Mt. Hakkoda in winter

Other routes

Operation period late 11 month to late 3 month⑥ Oirase Gorge Hot Springs ⇔ Mt. Hakkoda Course 18,000 to 20,000 yen (via Tashirodaira)
  • Hakkoda Ski Area
  • Tashirodaira Prefectural Route 40

Oirase Keiryu Hot Spring Taxi Fares in Winter

⑥ Oirase Gorge Hot Springs ⇔ Mt. Hakkoda Course 18,000 to 20,000 yen (via Tashirodaira)

Item Number:544
Meter fare (approximate fare)One way ¥18,000-¥20,000(tax included)
Summary column

The flat-rate route between Oirase Keiryu Onsen and Mt. Hakkoda will be closed from late November to mid-March, so flat-rate route will be from early April to mid-November. From late November to late March, the route will be via Prefectural Route 40, Tashirodaira, and the regular metered fare will apply.
*The tour may not be able to run due to weather conditions on the day.

Hakkoda Winter Course
<time required>
60 to 90 minutes (varies greatly depending on the weather of the day)
About 40 kilometers one way
<Course>
Oirase Keiryu Onsen
Prefectural Route 40 Tashirodaira
Hakkoda Ropeway Sanroku Station
Or
Sugayu hot spring
<Fee>
Ordinary car (up to 4 people) 1 to 18,000 yen (tax included)
Jumbo taxi (up to 9 people) 1 to 25,000 yen (approximate price including tax)
*If Tashirodaira Route 40 is closed due to weather conditions on the day, it may not be possible to operate. 
The Michinoku toll road fee of 860 yen will be paid by the customer.
Other operating routes
Back to TOP